See how tracking materials, labour, and machine time per production order gives manufacturers a clearer cost per unit and a stronger basis for pricing.

Costing ERP Manufacturing Odoo
Tracking Production Costs for Better Manufacturing Decisions

Introduction

Many manufacturers know their selling price and have a rough idea of their costs, but fewer can say with confidence what it actually costs to produce one unit. Without that number, it is hard to price correctly, to know which products are profitable, or to decide whether to make or buy.

This article explains how Odoo Manufacturing helps you build a cost picture from materials, work centre time, and other costs, and how to use it in everyday decisions.


The Challenge

Production cost estimates are often based on material cost alone, perhaps with a standard percentage added for everything else. This hides important differences. A product that needs a long machine setup and several operations is more expensive than a simple one that uses the same amount of material, but a flat markup treats them as equal.

Cost estimates also go stale. Material prices change, scrap occurs, and jobs take longer than planned. If the cost recorded in the system is never compared with what happened on the shop floor, the business keeps pricing according to assumptions that are no longer true.


Key Features

BoM Cost Overview
View the expected cost of a product based on its components and operations.
Work Centre Hourly Cost
Assign a cost per hour to machines or workstations so time spent is converted into cost.
Time Tracking on Work Orders
Record actual time per operation to compare planned and real duration.
Cost Analysis on Manufacturing Orders
Review the actual cost of materials and operations for each production order.
Costing Methods
Choose how product cost is valued, such as standard, average, or first in first out, to match accounting needs.

A Real-World Example

  • ✓Imagine a small manufacturer of stainless steel kitchen equipment. They make two products using the same sheet metal: a simple shelf and a custom prep table that requires welding, polishing, and assembly. Previously, they priced both with a standard markup on material cost.
  • ✓The company sets up work centres for cutting, welding, polishing, and assembly, each with an hourly cost that includes labour and machine running costs as the finance team defines them. Operations are added to the BoMs with expected durations. Operators start and stop work orders on a tablet to record actual time.
  • ✓After a month, the manager reviews the cost analysis of completed manufacturing orders. The shelf cost is close to the estimate, but the prep table takes noticeably longer in welding than planned, which raises its real cost. The company can now decide whether to adjust the price, improve the welding process, or revise the planned time.
  • ✓Cost tracking is only useful when the inputs are credible. Decide how hourly rates are calculated, make sure operators record time consistently, and involve your accountant so the costs in the system match your accounting approach.

Conclusion

Knowing what each product costs to make turns pricing and planning from guesswork into informed decisions. By capturing materials, time, and other costs, and comparing planned against actual, you can see where margins are healthy and where they are being lost.

Start with your most important products, keep the cost structure simple, and refine it as your team gets used to recording data. A reasonable cost today is more useful than a perfect one that never gets built.

Know what every product really costs to make, and price, plan, and improve with confidence. Book a Free Demo at hirebeans.cloud

Book a Free Demo
Got Questions?

Frequently Asked Questions

Do we need accounting integration to track production costs?

Cost tracking within manufacturing works on its own, but connecting it to accounting gives a consistent view of valuation and margins. Discuss the setup with your accountant.

How do we decide the hourly cost of a work centre?

Typically, this combines labour and machine-related costs for the hour. The exact method is a finance decision, and the system will use the rate you enter.

Why do planned and actual costs differ?

Common reasons include material price changes, scrap, and operations taking longer than planned. Comparing the two helps you decide whether to fix the process or update the plan.